| Model Number: | 41x21 |
| MOQ: | 1000 pieces |
| Price: | $ 0.9-2.4 |
| Payment Terms: | T/T, PayPal, Xtransfer |
| Supply Ability: | 50000 pieces per day |
| Parameter Item | Detailed Information |
|---|---|
| Executed Industry Standard | ASTM International Standard |
| Manufacturing Origin | China |
| Alloy Classification | Non-alloy carbon steel |
| Fast Small Order Lead Time | Within 7 working days |
| Cross Section Profile | C & U universal strut channel |
| Overall Dimensional Tolerance | ±1% |
| Core Usage | Construction structural support channel |
| Commercial Product Name | Cold Rolled Galvanized C/U Metal Support Channel |
| Surface Appearance | Natural silver zinc matte finish |
| Quality Management Certificate | ISO9001 |
| Main Export Loading Port | Tianjin Port |
| Core Function | Engineering load-bearing support framework |
We are a professional steel profile manufacturing factory. All global clients are warmly invited to arrange factory site visits anytime. Our production workshop is equipped with full sets of advanced automated production machines for steel structure and metal channel processing. Full independent in-house production helps us stabilize product quality and deliver competitive factory direct wholesale prices.
Our sales specialists will confirm accurate production lead time according to your order specifications and quantity. Customers placing large bulk orders are recommended to coordinate production schedules with our order management team in advance. Normally all finished goods will be ready for shipment within 30 days after deposit receipt, and separate partial shipments are acceptable for oversized orders.
Yes, our professional engineering group can create exclusive structural schemes fully based on your project requirements. We will supply architectural sketches, structural schematic drawings, processing detail blueprints and field installation drawings for your step-by-step confirmation during the whole project cycle.
30% advance deposit after order confirmation, the remaining 70% full balance must be settled before cargo delivery.